Liao Liaohe Drilling Engineering Co.,Ltd.http://www.lhdc.com.cn/Release Time: 2012-06-14 09:02:31
1.Introduction
The Model XJ90 is mainly used for workover, formation testing, fishing and pump inspection operations in shallow wells. Its main working systems are lifting system, rotating system and chassis running system. Equipped with drilling floor and related components for overhaul and sidetracking and water well drilling operations.
2. Main Technical Parameters
Model |
XJ90 |
Note |
Workover Depth(2 7/8″ EUE Tubing)m(ft) |
4000(13120) |
|
Overhaul Depth (2 7/8″DP)m(ft) |
3200(10498) |
|
(3 1/2″DP)m(ft) |
2600(8530) |
|
Nominal Hook Load kN(lb) |
600(134880) |
|
Max. Hook Load kN(lb) |
900(202320) |
|
Diameter of Drilling Line mm(in.)/Effective Numbers of Drilling Line (n) |
φ26(1)/6 |
|
Max Hoisting Speed of Hookm/s(ft/s) |
1.32(4.33) |
|
Transportation Dimension (L×W×H)(Includes Mast)m(ft) |
17.2×2.8×4.18(56.43×9.19×13.71) |
|
Weight kg(lb) |
38000(83776) |
|
|
|
|
Model |
XJ90 |
Note |
Workover Depth(2 7/8″ EUE Tubing)m(ft) |
4000(13120) |
|
Overhaul Depth (2 7/8″DP)m(ft) |
3200(10498) |
|
(3 1/2″DP)m(ft) |
2600(8530) |
|
Nominal Hook Load kN(lb) |
600(134880) |
|
Max. Hook Load kN(lb) |
900(202320) |
|
Diameter of Drilling Line mm(in.)/Effective Numbers of Drilling Line (n) |
φ26(1)/6 |
|
Max Hoisting Speed of Hookm/s(ft/s) |
1.32(4.33) |
|
Transportation Dimension (L×W×H)(Includes Mast)m(ft) |
17.2×2.8×4.18(56.43×9.19×13.71) |
|
Weight kg(lb) |
38000(83776) |
|
|
|
|