Liao Liaohe Drilling Engineering Co.,Ltd.http://www.lhdc.com.cn/Release Time: 2012-06-07 10:07:55
1. Introduction
The Model XJ60 workover rig is mainly used for overhaul,workover, formation testing, fishing operation and pump inspection in shallow wells.
2. Main Technical Parameters
Model |
XJ60 |
Note |
Workover Depth(2 7/8″EUE Tubing)m(ft) |
2600(8530) |
|
Nominal Hook Load kN(lb) |
300(67440) |
|
Max. Hook Load kN(lb) |
585(131508) |
|
Diameter of Drilling Line mm(in.)/Effective Numbers of Drilling Line(n) |
φ22(0.87)/6 |
|
Max Hoisting Speed of Hookm/s(ft/s) |
1.4(4.6) |
|
Transportation Dimension (L×W×H)(Includes Mast)m(ft) |
15.3×2.5×3.87(50.2×8.2×12.7) |
|
Weight kg(lb) |
22180(48898) |
|
Model |
XJ60 |
Note |
Workover Depth(2 7/8″EUE Tubing)m(ft) |
2600(8530) |
|
Nominal Hook Load kN(lb) |
300(67440) |
|
Max. Hook Load kN(lb) |
585(131508) |
|
Diameter of Drilling Line mm(in.)/Effective Numbers of Drilling Line(n) |
φ22(0.87)/6 |
|
Max Hoisting Speed of Hookm/s(ft/s) |
1.4(4.6) |
|
Transportation Dimension (L×W×H)(Includes Mast)m(ft) |
15.3×2.5×3.87(50.2×8.2×12.7) |
|
Weight kg(lb) |
22180(48898) |
|